Road Repair at 2232 3 Av NW
Asphalt was ground down then oiled and left like this for 3 months. There are several of these areas along 3 ave NW that have been sitting unfinished for months. When is this going to be fixed?
Issue: Uneven Surface / Cracks
Specific details of the issue: Road repair sitting unfinished for several months now
Specific location details: Multiple areas along 3 ave NW
Type of Road: Paved Public Road
address: 2232 3 AV NW
coordinates x,y: -7878.145257706657, 5657684.216875731
coordinates lat,lng: 51.05535619121206, -114.1123730105402
ward: 7
Timestamp | Description |
---|---|
Wed Jul 31, 2024 07:06pm | Opened |
Wed Jul 31, 2024 07:05pm | Submitted via iPhone |